Checking sign-in…
Login
Job Setup:
Operating Area…
California
Set
Set once. Attaches to every form you submit.
←
Back to Portal
HELP
← Back to Portal
🛢️ FLUID TRANSFER SAFETY
Fluid Transfer Permit Audit
Verify FTP Compliance & Safety Requirements
📋 Audit Information
Name of Auditor
*
Date
*
Company
*
Select...
A-C Electric
Location
*
Select...
Job Site
Prime Contractor Site
Substation
Data Center
Industrial Plant
Commercial Building
Shop / Yard
In Transit
Other
📋 Permit & Documentation
ℹ️ Pre-Transfer Requirements: Ensure all permits are complete and hazard assessments are documented before fluid transfer operations begin.
Fluid Transfer Permit filled out correctly & completely
*
Yes
No
Needs Improvement
N/A
Hazards adequately addressed for fluid type being transferred
*
Yes
No
Needs Improvement
N/A
THA completed and hazards identified correctly
*
Yes
No
Needs Improvement
N/A
🔧 Equipment & Lines
All lines physically walked down prior to transfer
*
Yes
No
Needs Improvement
N/A
Valve alignment verified & appropriate for job
*
Yes
No
Needs Improvement
N/A
Rated whip checks used at all connections
*
Yes
No
Needs Improvement
N/A
Lines inspected prior to beginning transfer
*
Yes
No
Needs Improvement
N/A
🛡️ Safety Measures
Bonding/grounding connections in place for flammables
*
Yes
No
Needs Improvement
N/A
Drip pans/duck ponds under every connection
*
Yes
No
Needs Improvement
N/A
📡 Communication & Staffing
Effective communications between all involved parties
*
Yes
No
Needs Improvement
N/A
Enough staff for task without environmental or safety risks
*
Yes
No
Needs Improvement
N/A
SIMOPS which impact safety or environmental aspects reviewed
*
Yes
No
Needs Improvement
N/A
💬 Observations
Opportunities for Improvement / Comments
Photos (take a picture or pick from your library, as many as you need)
Take Photo
Add Photo from Library
Add PDF
Photos and PDFs, 15MB max each. Attachments lock when the form is submitted.
Submit Fluid Transfer Audit
AnthroSafe™ Field Driven Safety
© 2026 SLP Alaska, LLC